Phased Commercial Renovation

This multi-phase renovation project brought together three separate facilities into a single, centralized office and warehouse space. Spanning over 55,000 square feet, the scope included the complete demolition and rebuild of office, lab, training, and service areas, along with upgrades to the warehouse environment. Delivered over two strategic phases, the project was carefully planned to minimize operational disruptions while meeting tight budget and timeline constraints. The team provided integrated design, construction, and engineering services, including HVAC, electrical, plumbing, AV/IT, and furniture procurement, ensuring a cohesive, functional, and modern workspace built for long-term use.

Consolidate three facilities into one centralized location

Create a functional layout for office, training, lab, and warehouse needs

Upgrade aging infrastructure and building systems

Minimize disruption to ongoing operations during construction

Stay on budget and meet key move-in deadlines tied to lease expirations

Phased construction to allow partial occupancy and business continuity

Integrated design-build approach for seamless coordination across trades

Specialized planning for lab HVAC, training areas, and generator installation

Full furniture, AV, and IT procurement and setup

Permitting and coordination with city and base building requirements

Centralized operations into one modern, multi-functional space

Completed on time and within a strict budget

Improved space utilization and employee density

Delivered a turnkey solution with minimal client disruption

Created a scalable environment aligned with future growth needs

This multi-phase renovation project brought together three separate facilities into a single, centralized office and warehouse space. Spanning over 55,000 square feet, the scope included the complete demolition and rebuild of office, lab, training, and service areas, along with upgrades to the warehouse environment. Delivered over two strategic phases, the project was carefully planned to minimize operational disruptions while meeting tight budget and timeline constraints. The team provided integrated design, construction, and engineering services, including HVAC, electrical, plumbing, AV/IT, and furniture procurement, ensuring a cohesive, functional, and modern workspace built for long-term use.

Consolidate three facilities into one centralized location

Create a functional layout for office, training, lab, and warehouse needs

Upgrade aging infrastructure and building systems

Minimize disruption to ongoing operations during construction

Stay on budget and meet key move-in deadlines tied to lease expirations

Phased construction to allow partial occupancy and business continuity

Integrated design-build approach for seamless coordination across trades

Specialized planning for lab HVAC, training areas, and generator installation

Full furniture, AV, and IT procurement and setup

Permitting and coordination with city and base building requirements

Centralized operations into one modern, multi-functional space

Completed on time and within a strict budget

Improved space utilization and employee density

Delivered a turnkey solution with minimal client disruption

Created a scalable environment aligned with future growth needs

Completion
0
Size
sq.ft.
Completion
0

$3.5M

Size

55,000

sq.ft.
PROJECT PROGRESS 100%

BEFORE

An outdated layout with closed-off rooms and limited functionality. This space was fully demolished to make way for a more open, efficient, and purpose-driven design.

AFTER

A collaborative hub with modern workstations, an exposed ceiling, and a bold accent colour that anchors the space.

BEFORE

This space was dated, underutilized, and in need of a major refresh. With worn finishes, outdated fixtures, and a lack of functionality, it was ready for a complete reimagination. Our renovation team saw the potential to turn this blank slate into a modern, efficient, and vibrant workplace.

AFTER

What was once a dated and disconnected space is now a modern, high-performance environment. From sleek meeting rooms to a vibrant training facility, every area was thoughtfully redesigned with functionality, aesthetics, and flexibility in mind. The result is a professional space that inspires productivity, collaboration, and confidence.

BEFORE
AFTER

Now redesigned with clean lines, upgraded technology, and a refined aesthetic, the boardroom supports confident collaboration and client-facing presentations.